Ambimat GroupAmbimatAmbiSecureV2XeSIMAmbiAutomationAhmedabad · India · Est. 1982
Developers · Standards

The V2X standards library.

A catalogue of the documents themselves — one canonical record per document or edition, filterable by country, document type, status and technology. Each record says what the document is, what it binds, which band and which equipment it covers, where the publisher's own copy lives, what it costs, and exactly what was checked and what was not.

Three distinctions do most of the work here, and most published summaries of V2X regulation collapse at least one of them. A spectrum authorisation is not a message standard. A standards-body document is not automatically a legal requirement. A consultation is not a final rule. Status and binding effect are therefore separate fields, and neither is inferred from the other. Where something could not be established from the publisher, the record says so rather than filling the gap.

The catalogue

35 documents, 18 jurisdictions.

Verification pass 29 September 2026 · 34 of 35 records read from the publisher’s own text · every record carries what was checked and what was not

FCC 24-123 Use of the 5.850–5.925 GHz Band — Second Report and Order

Published finalMandatorySpectrum

The order that made C-V2X the only permitted technology in the US 5.9 GHz ITS band and set the end of DSRC. Three 10 MHz channels at 5895–5925 MHz, combinable to 20 or 30 MHz. It is a radio rule: it authorises transmission, it does not require any vehicle to carry a radio and it mandates no 3GPP release.

Relevance to 5.9 GHz LTE C-V2X PC5 Directly relevant. It is the instrument under which a 5.9 GHz PC5 device may be operated in the United States, and it fixes the band edges and emission limits a US-market design has to meet.

Jurisdiction
United States
Issuing organisation
Federal Communications Commission (FCC)
Edition
Second Report and Order (ET Docket No. 19-138)
Published
21 November 2024
Effective
11 February 2025
Supersedes
unknown
Band
5895–5925 MHz
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units, Roadside units
Access
Free — FCC
Last verified
29 September 2026
Verification note — Publisher’s own text read

Adopted 20 November 2024, released 21 November 2024, read from the order itself. The order sets the DSRC sunset as two years from Federal Register publication and carries date placeholders, so the operative dates were read from the codified rule: 47 CFR 90.350(a) states that DSRCS stations must cease operations in 5895–5925 MHz no later than 14 December 2026 and that no new DSRCS licences issue after 11 February 2025. Federal Register publication was 13 December 2024 (document 2024-28980), with a correction published 17 January 2025 (2025-00642).

Read it at Federal Communications Commission →

J2735_202409 V2X Communications Message Set Dictionary

Published finalVoluntaryMessages

The North American message set: the data frames and elements that BSM, SPaT, MAP, TIM and the rest are built from. A voluntary SAE standard, not a regulation — no authority requires it by name in the FCC rules.

Relevance to 5.9 GHz LTE C-V2X PC5 Defines what a US-profile PC5 device sends, not how it transmits. Publication of an edition says nothing about whether any given product implements it.

Jurisdiction
United States
Issuing organisation
SAE International
Edition
SEP2024
Published
16 September 2024
Effective
unknown
Supersedes
J2735_202309
Band
unknown
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Paid — SAE International; no part of the text is reproduced here
Last verified
29 September 2026
Verification note — Publisher’s own text read

Designation, 16 September 2024 publication date, current status and the superseded J2735_202309 edition read from SAE's own catalogue record.

Read it at SAE International →

RSS-252 Intelligent Transportation Systems' (ITS) On-Board Units (OBUs) in the 5895-5925 MHz Band

Published finalEquipment conditionConformance

Canada's equipment certification standard for licence-exempt 5.9 GHz on-board units. Category I equipment: a unit needs a Technical Acceptance Certificate from ISED's Certification and Engineering Bureau, or a certificate from a recognised certification body, before it may be sold or operated.

Relevance to 5.9 GHz LTE C-V2X PC5 The highest-priority record in this catalogue for PC5 hardware. It is the Canadian market entry condition for a 5.9 GHz C-V2X on-board unit, it names 3GPP Release 14 C-V2X, and Issue 3 has fully replaced Issue 2 for new applications.

Jurisdiction
Canada
Issuing organisation
Innovation, Science and Economic Development Canada (ISED)
Edition
Issue 3
Published
12 December 2025
Effective
12 December 2025
Supersedes
RSS-252 Issue 2
Band
5895–5925 MHz
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units
Access
Free — ISED
Last verified
29 September 2026
Related
FCC 24-123
Verification note — Publisher’s own text read

Issue 3, published 12 December 2025 and effective on publication, read from ISED's own page. Scope quoted: it "sets out the certification requirements for licence-exempt on-board units (OBUs) radio apparatus operating in the 5895-5925 MHz frequency band". Transition: applications under Issue 2 or Issue 3 were accepted for six months from publication; that window closed in June 2026 and only Issue 3 applications are accepted now. Note that ISED's URL slug still carries the Issue 2 title wording "Dedicated Short-Range Communications (DSRC)"; the Issue 3 title does not, and Issue 3 addresses C-V2X per 3GPP Release 14. Roadside units are outside this RSS and no Canadian RSU instrument was established in this pass.

Read it at Innovation →

Comunicado 70/2021 IFT approves submitting to public consultation the questionnaire on spectrum needs for intelligent transport systems in the 5850-5925 MHz band

El IFT aprueba someter a consulta pública el cuestionario sobre necesidades de espectro para sistemas de transporte inteligente en la banda de frecuencias 5850-5925 MHz

Draft or consultationBinding effect unknownSpectrum

Mexico asked the market what it needed at 5.9 GHz. That is the whole of what this document does. It is listed here so that the consultation is not mistaken for an allocation.

Relevance to 5.9 GHz LTE C-V2X PC5 None yet. No Mexican authorisation for 5.9 GHz PC5 operation is established by this document.

Jurisdiction
Mexico
Issuing organisation
Instituto Federal de Telecomunicaciones (IFT)
Edition
As published
Published
20 August 2021
Effective
unknown
Supersedes
unknown
Band
5850–5925 MHz
Technology
Technology neutral
Applies to
Not stated
Access
Free — IFT
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read from IFT's own communication. It approved putting a questionnaire out to public consultation for twenty working days, 20 August to 17 September 2021. It is an information-gathering step and carries no binding effect: it allocates nothing, authorises nothing and decides nothing. No later Mexican instrument was traced through the current register or the Diario Oficial in this pass, and none should be inferred either way. Re-checked on 29 September 2026 for anything final that supersedes it. Nothing was found, and two things changed that a reader should know. The Instituto Federal de Telecomunicaciones no longer exists as the regulator: its own site now carries a banner stating that it is a historical archive for consultation only and directing current business to the Comision Reguladora de Telecomunicaciones. And the only current Mexican regulatory text found touching 5850-5925 MHz treats the band as an adjacent band to be protected in the 5925-6425 MHz unlicensed proceedings, not as an ITS designation. The status stays draft or consultation and the binding effect stays unknown.

Read it at Instituto Federal de Telecomunicaciones →

Decision (EU) 2020/1426 Commission Implementing Decision (EU) 2020/1426 on the harmonised use of radio spectrum in the 5 875-5 935 MHz frequency band for safety-related applications of intelligent transport systems (ITS) and repealing Decision 2008/671/EC

Published finalMandatorySpectrum

The parent EU spectrum instrument. It harmonises 5875–5935 MHz across the Union for safety-related ITS and splits it between road and urban rail. Road ITS gets 5875–5925 MHz, not the whole 60 MHz, and the top 10 MHz is urban rail only.

Relevance to 5.9 GHz LTE C-V2X PC5 Sets the band a European PC5 device operates in and the priority rules it shares the band under. It is technology-neutral: it permits PC5 and ITS-G5 alike and endorses neither.

Jurisdiction
European Union
Issuing organisation
European Commission
Edition
As amended
Published
9 October 2020
Effective
30 June 2021
Supersedes
Decision 2008/671/EC
Band
5875–5935 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — EUR-Lex
Last verified
29 September 2026
Verification note — Publisher’s own text read

Adopted 7 October 2020, notified as C(2020) 6773, published OJ L 328/19 on 9 October 2020. Operative articles read in full. Article 3(1): Member States were to designate 5875–5935 MHz for ITS by 30 June 2021 and to limit 5925–5935 MHz to urban rail ITS. Article 3(2): road ITS has priority below 5915 MHz, urban rail ITS above it. Article 3(3): access by road ITS to 5915–5925 MHz is limited to infrastructure-to-vehicle connectivity only. Article 3(4): urban rail access to 5925–5935 MHz is shared and subject to national circumstances. Its Annex was replaced in full by Decision (EU) 2026/1800. HUMAN_BROWSER_VERIFIED = YES: EUR-Lex answers command-line, CI and WebFetch clients alike with an empty HTTP 202 bot challenge, confirmed again on 30 September 2026; the article text above was read in a desktop browser, the only client observed to render it. WATCHER_FETCHABLE = YES, THROUGH OFFICIAL METADATA (from 16 October 2026): EUR-Lex still refuses automated clients, so the weekly watcher reads the Publications Office cellar notice for CELEX 32020D1426 instead and asks a person to review any change to its in-force status, dates, identifiers or amendment, repeal and consolidation links. It watches the metadata, not the article text. STATUS RE-CHECKED 14 October 2026 from the Publications Office cellar metadata (publications.europa.eu, Accept: application/rdf+xml), the official alternative to the EUR-Lex page this checker cannot fetch: in force; entry into force 9 October 2020; amended by Implementing Decision (EU) 2026/1800; Decision 2008/671/EC, which it repeals, is recorded as no longer in force from 9 October 2020. The 30 June 2021 date in effective_on is the Article 3 designation deadline, not entry into force.

Read it at European Commission →

Decision (EU) 2026/1800 Commission Implementing Decision (EU) 2026/1800 amending Implementing Decision (EU) 2020/1426 as regards introducing wider frequency channels in the Union-harmonised 5,9 GHz frequency band for safety-related applications of road intelligent transport systems

Published finalMandatorySpectrum

The amendment that allows 20 MHz channels in the European 5.9 GHz road ITS band, by combining two adjacent 10 MHz blocks. It comes with one limitation that matters: the 20 MHz channel at 5905–5925 MHz may be used for infrastructure-to-vehicle communications only, because its upper half overlaps the 5915–5925 MHz range where road ITS has been restricted to I2V since 2020 to protect urban rail. This is not a ban on 20 MHz channels generally, and it is not a restriction on the 10 MHz channels.

Relevance to 5.9 GHz LTE C-V2X PC5 Directly relevant to European PC5 channel planning. A 20 MHz PC5 carrier is now permitted in the band, but a design that assumes vehicle-to-vehicle transmission on a 20 MHz channel at 5905–5925 MHz is planning against a channel the Decision does not permit it on.

Jurisdiction
European Union
Issuing organisation
European Commission
Edition
As adopted
Published
28 July 2026
Effective
unknown
Supersedes
unknown
Band
5875–5935 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — EUR-Lex
Last verified
29 September 2026
Verification note — Publisher’s own text read

Adopted 24 July 2026, notified as C(2026) 5125, published in the OJ L series on 28 July 2026. Article 1 replaces the Annex to Decision (EU) 2020/1426 in full; the operative Annex was read before this record was written. The frequency-arrangement row states: "Two blocks may be combined in one contiguous 20 MHz channel" and then "Use of the 20 MHz channel formed by two blocks of 10 MHz within the frequency band 5 905-5 925 MHz shall be limited to infrastructure-to-vehicle communications, noting that restrictions apply to the frequency band 5 915-5 925 MHz in accordance with Article 3(3)." Recital 6 gives the reason: the limitation stands pending the availability of solutions ensuring protection of urban rail ITS in 5915–5925 MHz, following CEPT Report 91 adopted 7 November 2025. The new Annex also adds an unwanted-emissions limit above 5925 MHz of -30 dBm/MHz EIRP for road ITS and restates TPC as a requirement to reduce total power from its maximum to 3 dBm EIRP, where the 2020 Annex specified a TPC range of at least 30 dB. The Decision carries no separate Member State application deadline. HUMAN_BROWSER_VERIFIED = YES: EUR-Lex answers command-line, CI and WebFetch clients alike with an empty HTTP 202 bot challenge, confirmed again on 30 September 2026; the Annex text above was read in a desktop browser, the only client observed to render it. WATCHER_FETCHABLE = YES, THROUGH OFFICIAL METADATA (from 16 October 2026): EUR-Lex still refuses automated clients, so the weekly watcher reads the Publications Office cellar notice for CELEX 32026D1800 instead and asks a person to review any change to its in-force status, dates, identifiers or amendment, repeal and consolidation links. It watches the metadata, not the Annex text. STATUS RE-CHECKED 14 October 2026 from the Publications Office cellar metadata (publications.europa.eu, Accept: application/rdf+xml), the official alternative to the EUR-Lex page this checker cannot fetch: in force; entry into force 24 July 2026; amends Implementing Decision (EU) 2020/1426.

Read it at European Commission →

ETSI EN 303 613 Intelligent Transport Systems (ITS); LTE-V2X Access layer specification for Intelligent Transport Systems operating in the 5 GHz frequency band

Published finalVoluntaryRadio and access

The European access-layer profile for LTE-V2X: how PC5 is used on the ITS band in Europe. A voluntary ETSI deliverable, free to download, and not by itself a permission to transmit anywhere.

Relevance to 5.9 GHz LTE C-V2X PC5 The European counterpart to a PC5 deployment profile. Relevant to any Release 14 PC5 design targeting Europe, but publication of the EN implies nothing about conformity of any particular product.

Jurisdiction
European Union
Issuing organisation
ETSI
Edition
V1.1.1
Published
1 January 2020
Effective
unknown
Supersedes
unknown
Band
5855–5925 MHz
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units, Roadside units
Access
Free — ETSI
Last verified
29 September 2026
Verification note — Publisher’s own text read

Resolved on 29 September 2026, when ETSI's deliver server answered normally after returning HTTP 522 throughout the previous pass. The parent directory for this deliverable lists exactly three entries, 01.01.00_20, 01.01.01_30 and 01.01.01_60, the last dated 8 January 2020 and the only published version. V1.1.1 is therefore the current published edition, not merely the edition a publisher URL happened to resolve to. The document itself was downloaded and its history page read: publication as ETSI TS 103 613 in November 2018, EN approval procedure from 6 May to 5 August 2019, vote from 23 October to 23 December 2019, publication January 2020. Still not established: whether this EN is cited in the Official Journal as a harmonised standard under Directive 2014/53/EU. EUR-Lex answered every request in this pass with HTTP 202 and an empty body, which is an access failure. Note also that EN 303 613 is an access-layer specification, so the harmonised standard for the band is EN 302 571 rather than this one. RESOLVED 29 September 2026, the Official Journal question included. EUR-Lex blocks command-line and CI clients with an empty HTTP 202, so its full-text search was run in a desktop browser. The exact phrase "EN 303 613" returns NO RESULTS anywhere in EUR-Lex. The control matters: "EN 302 571" returns 30 documents in the same search, including Commission Implementing Decision (EU) 2022/2191 of 8 November 2022 on the harmonised standards for radio equipment drafted in support of Directive 2014/53/EU, whose annex entry 113 reads "EN 302 571 V2.1.1 Intelligent Transport Systems (ITS); Radiocommunications equipment operating in the 5 855 MHz to 5 925 MHz frequency band; Harmonised Standard covering the essential requirements of Article 3(2) of Directive 2014/53/EU". So EN 303 613 is NOT an OJ-cited harmonised standard and carries no presumption of conformity under the Radio Equipment Directive; in this band that presumption runs through EN 302 571 V2.1.1. That is consistent with what EN 303 613 is -- an access-layer specification rather than a radio-spectrum standard -- and it means citing it as a route to EU market access would be wrong.

Read it at ETSI →

EU C-ITS Certificate Policy Certificate Policy for Deployment and Operation of European Cooperative Intelligent Transport Systems (C-ITS)

Published finalGuidanceSecurity

The trust policy behind the EU C-ITS credential system: who may run a root CA, what a certificate may assert, and how the trust list is governed. Release 3.1 adds the National Transport Authority and a defined set of governmental and regulated services. It is a governance document, not a radio permission.

Relevance to 5.9 GHz LTE C-V2X PC5 Applies to the credentials a European station carries, not to its radio. A device can be perfectly legal on the band and still have no trusted certificate.

Jurisdiction
European Union
Issuing organisation
European Commission, Joint Research Centre (C-ITS Point of Contact)
Edition
Release 3.1, June 2026
Published
29 June 2026
Effective
unknown
Supersedes
unknown
Band
unknown
Technology
Technology neutral
Applies to
On-board units, Roadside units, Credential authorities
Access
Free — JRC / CPOC
Last verified
29 September 2026
Verification note — Publisher’s own text read

SUPERSEDED EDITION CORRECTED. This record carried Release 3.0 of May 2024. On 29 September 2026 the CPOC documentation page was opened in a desktop browser -- where its document list does render, though it does not for any command-line client -- and it lists newer releases, which were then downloaded and read. The Certificate Policy is now Release 3.1, June 2026 (file dated 29 June 2026). Its own release table reads Release 1 June 2017, Release 1.1 June 2018, Release 2.0 March 2019, Release 3.0 May 2024, Release 3.1 June 2026, and its version history states that Release 3.1 introduced the National Transport Authority, defined a set of minimum governmental and regulated services and use cases in a new Annex II, updated the text on that authority and on permissions for governmental and regulated services, and modified the audit-log protection clause at 5.4.4. The companion Security Policy was also read at source for the first time: Release 3.1, September 2026 (file dated 14 September 2026). The CPOC also publishes CPOC Protocol Release 3.3 of 29 June 2026 and annexes of approved protection profiles dated 14 April 2026. The source_url now points at the documentation page rather than at one release PDF, because watching a fixed PDF is exactly how this edition change went unnoticed: the old file never changed, the page did.

Read it at European Commission →

SI 2023/243 The Wireless Telegraphy (Exemption) (Amendment) Regulations 2023

Published finalMandatorySpectrum

The legal half of the UK arrangement. It removes the licence requirement for 5.9 GHz ITS apparatus and then delegates every technical condition to Ofcom's interface requirement, which is why the two have to be read together.

Relevance to 5.9 GHz LTE C-V2X PC5 The instrument under which a 5.9 GHz PC5 device operates licence-exempt in the UK. It is technology-neutral and names neither C-V2X nor ITS-G5.

Jurisdiction
United Kingdom
Issuing organisation
Office of Communications (Ofcom), by statutory instrument
Edition
As made
Published
2 March 2023
Effective
23 March 2023
Supersedes
unknown
Band
5875–5925 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — legislation.gov.uk
Last verified
29 September 2026
Related
IR 2086
Verification note — Publisher’s own text read

Made 2 March 2023 under sections 8(3) and 122(7) of the Wireless Telegraphy Act 2006, in force 23 March 2023. Operative text read in full. It revokes the Wireless Telegraphy (Intelligent Transport Systems) (Exemption) Regulations 2011 and inserts regulation 10 into the Wireless Telegraphy (Exemption) Regulations 2021: apparatus in 5875–5925 MHz is exempt from section 8(1) licensing if it complies with IR 2086 as published by Ofcom in March 2023, does not cause or contribute to undue interference, and is or is part of a safety-related intelligent transport system. "Intelligent transport system" is defined for road transport only. The instrument draws no distinction between vehicle-based and roadside apparatus.

Read it at Office of Communications →

IR 2086 Interface Requirement 2086 — Safety Related Applications of Intelligent Transport Systems (ITS)

Published finalEquipment conditionRadio and access

The technical half of the UK arrangement, and the document the licence exemption actually hangs on. Power limits and interference mitigation, no channel plan, no named technology.

Relevance to 5.9 GHz LTE C-V2X PC5 These are the numbers a UK-market PC5 device is held to. Note that it sets no channel raster, so channelisation is left to the standard the equipment follows.

Jurisdiction
United Kingdom
Issuing organisation
Office of Communications (Ofcom)
Edition
Version 2.0
Published
1 March 2023
Effective
unknown
Supersedes
IR 2086 Version 1.0 (April 2011)
Band
5875–5925 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — Ofcom
Last verified
14 October 2026
Verification note — Publisher’s own text read

The live Ofcom document was read on 29 September 2026 and is Version 2.0, publication date March 2023 — the same edition SI 2023/243 names, and the current one. Table 3.1: frequency band 5875 to 5925 MHz; maximum mean transmit power 23 e.i.r.p. dBm/MHz; maximum total transmit power 33 dBm mean e.i.r.p. with a TPC range of at least 30 dB; channel access and occupation rules requiring interference mitigation at least equivalent to ETSI EN 302 571; authorisation regime licence exempt; references EN 302 571 and EN 302 665; Northern Ireland notification number 2022/7004/XI. Channelling is recorded as "N/A" — Ofcom specifies no channel plan. Source conflict, unresolved: the document history table describes Version 2.0 as "Amended to include 5805-5825 MHz", but 5805–5825 MHz appears nowhere in Table 3.1 or elsewhere in the document, and SI 2023/243 exempts only 5875–5925 MHz. Ofcom has not been asked to reconcile this and the site does not guess at which is intended. Re-read on 14 October 2026: still Version 2.0, March 2023, with the same Table 3.1 values. Ofcom answers 403 to the GitHub runner but serves the PDF to a desk client.

Read it at Office of Communications →

Vfg. 48/2021, last amended by Vfg. 102/2025 General assignment of frequencies for safety-related radio applications of intelligent transport systems (ITS) in the 5875–5915 MHz frequency range

Allgemeinzuteilung von Frequenzen für sicherheitsbezogene Funkanwendungen intelligenter Verkehrssysteme (Intelligent Transport Systems, ITS) im Frequenzbereich 5875 – 5915 MHz

Published finalMandatorySpectrum

Germany's national implementation, and a caution against reading the EU band as a national permission. Germany assigns 5875–5915 MHz generally — 40 MHz, not the EU's 50 MHz of road ITS spectrum and not 60 MHz — everything above 5915 MHz needs an individual assignment, and the assignment itself runs out at the end of 2026.

Relevance to 5.9 GHz LTE C-V2X PC5 A PC5 deployment in Germany is planned against 5875–5915 MHz in 10 MHz blocks, not against the EU-wide range and not, on this assignment, against a 20 MHz channel.

Jurisdiction
Germany
Issuing organisation
Bundesnetzagentur
Edition
November 2025
Published
1 November 2025
Effective
unknown
Supersedes
unknown
Band
5875–5915 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — Bundesnetzagentur
Last verified
29 September 2026
Verification note — Publisher’s own text read

Consolidated PDF read in full; the Bundesnetzagentur general-assignment index still listed this as the current ITS assignment at its 15 April 2026 revision. Issued under § 55 TKG and stated to be a partial implementation of Decision (EU) 2020/1426 in Germany. Parameters: 23 dBm/MHz maximum spectral EIRP density (200 mW/MHz) and 33 dBm maximum EIRP (2 W), with TPC over a range of at least 30 dB. Road ITS takes priority over urban rail ITS. Frequency arrangement: 10 MHz blocks from 5875 MHz, channels within block boundaries, bandwidth may be lower than 10 MHz — no provision for combining blocks into a 20 MHz channel. Two conditions are easy to miss and are the reason this record exists: the assignment is time-limited and expires on 31 December 2026, and for 5915–5935 MHz every ITS radio application must apply to the Bundesnetzagentur for an individual frequency assignment.

Read it at Bundesnetzagentur →

MIIT 5905–5925 MHz LTE-V2X direct communication management rules Management rules for the use of 5905–5925 MHz for LTE-V2X direct communication

车联网(智能网联汽车)直连通信使用5905-5925MHz频段管理规定(暂行)

Published finalMandatorySpectrum

China's 20 MHz allocation for V2X direct communication, and the only major allocation that names a single technology in its operative text. It is also a licensing instrument: roadside equipment is licensed, vehicle equipment is not.

Relevance to 5.9 GHz LTE C-V2X PC5 The Chinese band a PC5 device must be designed to: 20 MHz in total. Since 国无办函〔2024〕113号 it can be used as one 20 MHz channel or as 10 MHz halves, vehicle-borne equipment at 5905–5915 MHz and roadside equipment at 5915–5925 MHz, which still leaves little room for a second carrier.

Jurisdiction
China
Issuing organisation
Ministry of Industry and Information Technology (MIIT)
Edition
工信部无〔2018〕203号
Published
25 October 2018
Effective
1 December 2018
Supersedes
unknown
Band
5905–5925 MHz
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units, Roadside units
Access
Free — State Council policy database
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read in full on 29 September 2026 from the State Council policy database, which publishes this notice with MIIT named as the issuing body, the document number 工信部无〔2018〕203号, the source given as the MIIT website, and the date of record 25 October 2018. MIIT's own servers remained unreachable from the verification network, so this is the Chinese government's own publication of the instrument rather than the issuing ministry's copy. Article 1 plans 5905-5925 MHz as the working band for V2X direct communication based on LTE-V2X technology and defines that communication as direct exchange between roadside, vehicle-borne and portable radio equipment. Article 2 requires a frequency use licence from the national radio administration for roadside equipment, and a radio station licence from the provincial administration once granted; roadside equipment without a station licence may not transmit and gets no interference protection. Article 3 manages vehicle-borne and portable equipment like public mobile terminals, with no frequency or station licence required. Article 4 requires a radio transmission equipment type approval certificate for equipment made or imported for sale or use in China. Article 5 stops new satellite earth station authorisations in the band from 1 January 2022 except for tracking stations. Article 7 sets separations of 7 km from radar stations and 2 km from satellite earth stations for roadside equipment. Article 10 brings the rules into force on 1 December 2018. An annex carries the equipment technical requirements. The channel configuration was later refined by 国无办函〔2024〕113号.

Read it at Ministry of Industry and Information Technology →

GB/T 45315-2025 Technical requirements and test methods of vehicular information interactive systems based on LTE-V2X direct communication

基于LTE-V2X直连通信的车载信息交互系统技术要求及试验方法

Published finalVoluntaryConformance

China's national test standard for LTE-V2X direct-communication on-board systems: system description, vehicle-environment requirements, positioning and timing, functional and communication-performance requirements, and the test methods for them. Recommended, not compulsory, and scoped to M and N category vehicles.

Relevance to 5.9 GHz LTE C-V2X PC5 The closest thing China has to a published PC5 equipment test baseline. Being a GB/T it binds nobody by itself; it becomes an obligation only where a contract or another instrument calls it up.

Jurisdiction
China
Issuing organisation
State Administration for Market Regulation (SAMR) and Standardization Administration of China (SAC)
Edition
2025
Published
28 February 2025
Effective
28 February 2025
Supersedes
unknown
Band
5905–5925 MHz
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units
Access
Free — SAMR/SAC national standards platform (record and online preview)
Last verified
29 September 2026
Verification note — Publisher’s own text read

Resolved on 29 September 2026. SAMR is unreachable from this desk but IS reachable from a GitHub Actions runner, so the record was fetched from the publisher through CI and read: the national public service platform for standards information, operated by SAMR and SAC, gives standard number GB/T 45315-2025; Chinese title 基于LTE-V2X直连通信的车载信息交互系统技术要求及试验方法; English title "Technical requirements and test methods of vehicular information interactive systems based on LTE-V2X direct communication"; status 现行, in force; Chinese classification T 36; ICS 43.040.10; issue date 2025-02-28 and implementation date 2025-02-28; competent and administering department the Ministry of Industry and Information Technology; issuing bodies SAMR and SAC. That is the publisher's own record, so the number, both titles, the issuing bodies, both dates and the in-force status move from corroborated to verified. The FULL TEXT is still not read: the platform offers an online preview and no test parameter from the standard is asserted anywhere on this site. The M and N vehicle-category scope recorded earlier came from independent registries and is not on the SAMR record, so it is no longer relied on. GB/T denotes a recommended national standard, which is why the binding effect stays voluntary.

Read it at State Administration for Market Regulation →

ARIB STD-T109 700 MHz Band Intelligent Transport Systems

Published finalVoluntaryRadio and access

Japan's deployed V2V and V2I radio interface — the one behind ITS Connect, launched 2015. It is a different band and a different radio from anything at 5.9 GHz, and it is included here for jurisdiction context only.

Relevance to 5.9 GHz LTE C-V2X PC5 None. This is not C-V2X, not PC5 and not 5.9 GHz. Japan's 5.9 GHz work is a separate and so far unfinished matter: the MIC frequency reorganisation action plan describes an assignment to be considered, which is a plan and not a designation. ARIB STD-T109 is outside Ambimat's product scope and nothing here implies support for it.

Jurisdiction
Japan
Issuing organisation
Association of Radio Industries and Businesses (ARIB)
Edition
Version 1.3 (English translation 1.3-E1)
Published
27 July 2017
Effective
unknown
Supersedes
unknown
Band
700 MHz band MHz
Technology
700 MHz ITS (ARIB)
Applies to
On-board units, Roadside units
Access
Free — ARIB, including the English translation
Last verified
29 September 2026
Verification note — Publisher’s own text read

Version 1.3 dated 27 July 2017, with a free English translation 1.3-E1, read from ARIB's own standard page; no later version is listed there. ARIB designates this the 700 MHz band; the deployed ITS Connect service is commonly described as the 760 MHz system, and the exact channel centre was not re-read from the standard text in this pass.

Read it at Association of Radio Industries and Businesses →

TTAK.KO-06.0538 Radio Transmission and Access Technologies for Cellular Vehicle-to-everything (C-V2X)

셀룰러 차량통신(C-V2X)을 위한 무선전송 및 무선접속기술

Published finalVoluntaryRadio and access

TTA's descriptive overview of the 3GPP LTE and NR features that make up C-V2X. Useful orientation; it specifies no Korean deployment parameters.

Relevance to 5.9 GHz LTE C-V2X PC5 Background. It describes PC5 among other 3GPP features rather than profiling it for a Korean deployment — that is TTAK.KO-06.0642's job.

Jurisdiction
South Korea
Issuing organisation
Telecommunications Technology Association (TTA)
Edition
2020-12-10 (32 pp.)
Published
10 December 2020
Effective
unknown
Supersedes
unknown
Band
unknown
Technology
5.9 GHz LTE C-V2X PC5, NR-V2X
Applies to
On-board units, Roadside units
Access
Free — TTA; Korean-language PDF
Last verified
29 September 2026
Verification note — Publisher’s own text read

Publisher record read on 29 September 2026: TTAK.KO-06.0538, 10 December 2020, 32 pages. TTA's own abstract describes it as giving overall descriptions of the C-V2X transmission and access features defined in 3GPP LTE and NR, with notes on the characteristics of each. It is an overview document, not an implementation profile, and it is an ICT association standard (정보통신단체표준), not a legal instrument.

Read it at Telecommunications Technology Association →

TTAK.KO-06.0642 LTE-V2X PHY/RF Profile: RRC Preconfiguration

LTE-V2X 물리계층/주파수 프로파일: RRC 사전 설정

Published finalVoluntaryRadio and access

The Korean LTE-V2X sidelink preconfiguration profile: the RRC preconfiguration a device starts from when there is no network to tell it what to do. Channel bandwidth, frequency resources, transmit power, retransmissions, SLSS synchronisation and congestion control, with centre frequencies set to Korean regulation and parameters referenced from SAE J3161/1.

Relevance to 5.9 GHz LTE C-V2X PC5 The most directly useful PC5 engineering document in this catalogue after the equipment standards. Out-of-coverage Mode 4 operation depends entirely on preconfiguration, and this is Korea's. Its status is a voluntary association standard; publication implies no Korean approval of any product.

Jurisdiction
South Korea
Issuing organisation
Telecommunications Technology Association (TTA)
Edition
2025-12-05 (30 pp.)
Published
5 December 2025
Effective
unknown
Supersedes
unknown
Band
unknown
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units, Roadside units
Access
Free — TTA; Korean-language PDF
Last verified
29 September 2026
Verification note — Publisher’s own text read

Publisher record read on 29 September 2026: standard type 정보통신단체표준 (ICT association standard), 5 December 2025, 30 pages, produced by project group PG1104 under TC011. TTA's own English abstract states that it "defines key elements such as channel bandwidth, frequency resource configuration, transmit power, retransmission parameters, and synchronization settings (including sidelink synchronization signal, SLSS), as well as congestion control requirements (CR-limit, CBR)", and that it "references parameters in SAE J3161/1 to define center frequency settings in compliance with Korea regulations and SLSS-based synchronization configurations". The full Korean text has not been read, so no individual parameter value from it is stated here or anywhere else on this site.

Read it at Telecommunications Technology Association →

TTAK.KO-12.0432 V2X Communication Security Test Guidelines for C-ITS Services

C-ITS 서비스를 위한 V2X 통신 보안 시험 지침

Published finalVoluntarySecurity

How to test whether a V2X implementation actually does the security things it claims: 1609.2 certificate verification, message confidentiality, integrity of what is stored in OBU memory, and denial-of-service resistance.

Relevance to 5.9 GHz LTE C-V2X PC5 Applies above the radio, to the security functions a PC5 station performs. Relevant to anyone building to a Korean deployment; not a mandate and not a certification.

Jurisdiction
South Korea
Issuing organisation
Telecommunications Technology Association (TTA)
Edition
2025-12-05 (22 pp.)
Published
5 December 2025
Effective
unknown
Supersedes
unknown
Band
unknown
Technology
Technology neutral
Applies to
On-board units
Access
Free — TTA; Korean-language PDF
Last verified
29 September 2026
Verification note — Publisher’s own text read

Publisher record read on 29 September 2026: 5 December 2025, 22 pages. TTA's own English abstract states that it "standardizes security evaluation methods and criteria for functions enhancing security in the V2X communication environment, including certificate verification based on IEEE 1609.2, message encryption for confidentiality, integrity verification for critical data stored in OBU memory, and DoS attack defense capabilities". These are test guidelines. They are not a certification scheme and they create no obligation to be assessed against them.

Read it at Telecommunications Technology Association →

G.S.R. 466(E) Use of On Board Unit for Cellular Vehicle-to-Everything Communication in the 5.9 GHz band (Exemption from Licensing Requirements) Rules, 2026

Published finalMandatorySpectrum

India's licence exemption for 5.9 GHz on-board units — and only for on-board units, and only across the lower 30 MHz. It removes the spectrum licence. It does not remove equipment type approval, which rule 4(3) requires for each equipment type through the DoT portal.

Relevance to 5.9 GHz LTE C-V2X PC5 The instrument that makes a PC5 on-board unit operable in India without a spectrum licence, and the source of the power limits an Indian-market design is held to.

Jurisdiction
India
Issuing organisation
Ministry of Communications, Department of Telecommunications
Edition
As notified
Published
11 June 2026
Effective
11 June 2026
Supersedes
unknown
Band
5875–5905 MHz
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units
Access
Free — Gazette of India
Last verified
30 September 2026
Verification note — Publisher’s own text read

Gazette text read in full. Notification dated 10 June 2026, published in the Gazette of India Extraordinary Part II Section 3 Sub-section (i), No. 416, on 11 June 2026, made under sections 4 and 7 of the Indian Telegraph Act 1885 and sections 4 and 10 of the Indian Wireless Telegraphy Act 1933, in force on the date of publication. Rule 2: "They shall apply in respect of the 5875-5905 MHz frequency band." Rule 3(1)(e) defines an On Board Unit as radio equipment including its antenna operated as part of an intelligent transport system established for road transport that is installed on a vehicle, forms part of a vehicle, or is held or carried by an individual in relation to a vehicle — the third limb is easily missed. Rule 4(1) permits establishment, maintenance or working of such a unit for the sole purpose of cellular vehicle-to-everything communication without assignment of radio frequency, on a non-interference, non-protection and non-exclusive basis, and requires no licence for possession, sale or hire. The table gives 23 dBm/MHz maximum power spectral density EIRP and 33 dBm maximum EIRP for in-band emissions and -30 dBm/MHz for out-of-band emissions. Rule 4(3) requires permission and exemption to be sought for each equipment type through an application on the Department of Telecommunications portal, unless that equipment type is already approved and published there. Rule 4(4) requires conformity with standards notified by the Bureau of Indian Standards or the Central Government, and relevant international standards where none has been published. Roadside units are not within these rules and 5905–5925 MHz is not opened to on-board units by them. RECONFIRMED 30 September 2026: this source_url 403s to every non-browser client from this desk, but a GitHub Actions runner fetched the gazette PDF in full. Its Hindi text extracts with font-substitution artifacts (the PDF does not use a standard Unicode-mapped Devanagari font, so an automated extraction is not quoted verbatim here), but rule 2's numerals are unambiguous: 5875-5905, matching the 5875-5905 MHz scope recorded above, and the English-column text was not present in this bilingual gazette page range to cross-check independently. WATCHER_FETCHABLE = NO from this desk, fetchable from CI.

Read it at Ministry of Communications →

Draft AIS-230 Draft AIS-230 — C-V2X on-board unit requirements for factory-installed systems

Draft or consultationBinding effect unknownVehicle fitment

India's proposed standard for factory-fitted C-V2X on-board units, and the thing a proposed 2028 fitment requirement would be written around. It is a draft. Nothing in it is required of anyone.

Relevance to 5.9 GHz LTE C-V2X PC5 Potentially the largest single PC5 fitment requirement anywhere, if it is finalised. Until a final notification exists it constrains nothing, and no product can conform to a standard whose text is not published.

Jurisdiction
India
Issuing organisation
Ministry of Road Transport and Highways / Automotive Industry Standards Committee
Edition
Draft
Published
unknown
Effective
unknown
Supersedes
unknown
Band
5875–5925 (as quoted by MoRTH) MHz
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units
Access
Not publicly accessible
Last verified
30 September 2026
Verification note — Independent registries only — publisher unreachable

AIS-230 is a draft and is not in force. The text of the standard is not publicly accessible, so everything recorded about its contents comes from MoRTH's own description of it rather than from the document. The draft amendment to the Central Motor Vehicles Rules that would give it effect was published on 3 August 2026 for thirty days' comment; no final notification had been published in any accessible public source as of this verification pass. MoRTH quotes 5875–5925 MHz for the standard, which is wider than the range G.S.R. 466(E) actually exempts. CONFIRMED 30 September 2026: this source_url 403s to every non-browser client from every network tried from this desk, but the Press Information Bureau serves it to a GitHub Actions runner, which fetched the release in full. Its text matches this note: the 5.875-5.925 GHz range, the G.S.R. 466(E) cross-reference, and the phased dates (compliance for L/M/N category vehicles made on or after 1 October 2027, fitment on or after 1 October 2028) are MoRTH's own words, not a paraphrase. It adds that AIS-230's principal requirements cover radio performance and output power, receiver sensitivity, GNSS/positioning, electrical and power supply, EMI/EMC, cybersecurity and communication security, and road-safety-application performance; that its safety use cases are Emergency Brake Alert, Forward Collision Warning, Wrong-way Driving and Emergency Vehicle Alert; and that a Ministry Task Force recommended the 5.9 GHz range and the Central Motor Vehicles Rules-Technical Standing Committee considered the standard at its 56th meeting on 7 May 2026. None of this is the standard's own text, so the record stays secondary; WATCHER_FETCHABLE = NO from this desk, fetchable from CI, and the underlying AIS-230 document itself remains unpublished anywhere.

Read it at Ministry of Road Transport and Highways / Automotive Industry Standards Committee →

F2018L00026 (compilation F2021C01285) Radiocommunications (Intelligent Transport Systems) Class Licence 2017

Published finalMandatorySpectrum

The lightest-touch authorisation among the major markets: no application, no fee, one band, one power limit and one referenced European standard. "ITS station" covers vehicle and roadside alike.

Relevance to 5.9 GHz LTE C-V2X PC5 Relevant to Australian operation. Note what it does and does not say: it conditions operation on compliance with EN 302 571 and does not itself permit or forbid PC5 or ITS-G5 by name, so which technologies are allowed follows from that standard rather than from the licence.

Jurisdiction
Australia
Issuing organisation
Australian Communications and Media Authority (ACMA)
Edition
Compilation C02, 17 November 2021
Published
17 November 2021
Effective
unknown
Supersedes
unknown
Band
above 5855 and up to 5925
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — Federal Register of Legislation
Last verified
29 September 2026
Verification note — Publisher’s own text read

Compilation text read in full; the latest compilation is F2021C01285, compilation C02, dated 17 November 2021. Section 6(1) authorises a person to operate an ITS station subject to four conditions: it must be operated "on a frequency, or within a range of frequencies, greater than 5855 MHz and not greater than 5925 MHz" and "at a radiated power that does not exceed a maximum EIRP of 23 dBm/MHz"; it must not be operated within 70 kilometres of the Murchison Radioastronomy Observatory; it must comply with ETSI Standard EN 302 571; and it must comply with section 7. Section 6(2) makes the frequency and power conditions prevail over EN 302 571 in the event of inconsistency, and section 7 requires compliance with any applicable ACMA equipment rules. ACMA confirms no application and no fee. The instrument names no technology, sets no total-power limit beyond the per-megahertz figure, and draws no distinction between vehicle and roadside stations.

Read it at Australian Communications and Media Authority →

IMDA TS DSRC Technical Specification for Dedicated Short-Range Communications (DSRC) in Intelligent Transport Systems (ITS)

Published finalEquipment conditionRadio and access

A primary Singapore source does exist, and this is it. It is a DSRC specification, built on IEEE 802.11 and IEEE 1609, and it allocates 5855–5925 MHz for DSRC operation in Singapore.

Relevance to 5.9 GHz LTE C-V2X PC5 None, and this is the point of the record. The document is DSRC and mentions no cellular V2X technology. Nothing in it authorises PC5 operation in Singapore, and no Singaporean PC5 position should be inferred from it in either direction.

Jurisdiction
Singapore
Issuing organisation
Info-communications Media Development Authority (IMDA)
Edition
Issue 1 Revision 1
Published
1 October 2017
Effective
unknown
Supersedes
unknown
Band
5855–5925 MHz
Technology
DSRC
Applies to
On-board units, Roadside units
Access
Free to download from IMDA; IMDA's notice states it "shall not be distributed without written permission from IMDA", so it is linked and not mirrored
Last verified
14 October 2026
Verification note — Publisher’s own text read

Document read in full. Issue 1 Revision 1, October 2017, prepared by the Telecommunications Standards Advisory Committee working group on ITS-DSRC. Clause 1.1 bases it on IEEE 802.11 with PHY and MAC modifications, DSRC in the 5 GHz spectrum, and IEEE 1609 WAVE. Clause 5.4.1: "The 5.9 GHz frequency spectrum from 5.855 GHz to 5.925 GHz has been allocated for operation of DSRC in Singapore", divided into seven 10 MHz channels. It covers both on-board units and roadside units, with antenna-height conditions on RSUs above 8 m and up to 15 m, and restricts Power Class D devices and RSUs to public safety uses. The words C-V2X, LTE-V2X and PC5 do not appear anywhere in the document. Binding effect is recorded as unknown deliberately: the specification's preface is a placeholder and the document itself states no registration or type-approval obligation, so whether compliance is a condition of equipment registration in Singapore was not established in this pass. Legal effect established on 29 September 2026 from IMDA's own Equipment Registration Framework question-and-answer document, Issue 1 Revision 9, July 2023. It states that IMDA standards are Technical Regulations published in the form of Technical Specifications, and that registration under the General Equipment Registration scheme is mandatory for suppliers wishing to register DSRC equipment, which is named in the scheme's list. Enforcement runs through the Telecommunications (Dealers) Regulations, whose regulations 21 and 24 make a registration obtained on false information an offence, and through section 8 of the Telecommunications Act. The binding effect is therefore recorded as an equipment condition rather than unknown: it conditions supply of the equipment in Singapore, and it mandates nothing about vehicles or infrastructure. Re-read on 14 October 2026: still Issue 1 Revision 1, October 2017. IMDA presents a bot challenge to the GitHub runner but serves the PDF to a desk client.

Read it at Info-communications Media Development Authority →

TCROS 2024 Taiwan C-ITS Roadside Open Standards (TCROS) 2024

臺灣協同智慧運輸車聯網路側設施資通訊開放標準

Published finalVoluntaryMessages

Taiwan's open roadside profile: what a signal controller and a roadside unit say to each other, across ten message types. An industry standard, published free, adopted voluntarily.

Relevance to 5.9 GHz LTE C-V2X PC5 It is an application and message-profile standard and says nothing about spectrum or radio authorisation. Taiwan's 5.9 GHz position is a separate question this pass did not resolve — see the open questions on the catalogue page.

Jurisdiction
Taiwan
Issuing organisation
Taiwan Intelligent Transportation Industry Association (TTIA), TCROS working group
Edition
2024
Published
16 April 2024
Effective
unknown
Supersedes
unknown
Band
unknown
Technology
Technology neutral
Applies to
Roadside units
Access
Free — TTIA
Last verified
14 October 2026
Verification note — Publisher’s own text read

Publisher announcement read on 29 September 2026. TCROS is published by the Taiwan Intelligent Transportation Industry Association, an industry association and not a government regulator, on 16 April 2024, as a freely downloadable open standard. It covers ten message and protocol items — SPaT, V2X MAP, SRM, SSM, TIM, PSM, BSM, RSA, EVA and the TCROS use profile — and specifies communication between signal controllers and roadside infrastructure. It was developed with government participation, which is not the same thing as being issued by government. This catalogue does not present it as a binding national radio regulation, because it is not one and no source consulted here says it is. Re-read at source on 14 October 2026 from a GitHub runner: unchanged (2024 edition, published 16 April 2024, the same ten items).

Read it at Taiwan Intelligent Transportation Industry Association →

RSM ITS guidance page Intelligent transport systems — RSM guidance

HistoricalGuidanceSpectrum

New Zealand's published ITS guidance, and a good example of why a catalogue records the instrument rather than the impression. It describes 5.9 GHz as potentially suitable and decides nothing.

Relevance to 5.9 GHz LTE C-V2X PC5 None established. No New Zealand authorisation for 5.9 GHz PC5 follows from this page, and none is claimed here.

Jurisdiction
New Zealand
Issuing organisation
Radio Spectrum Management (RSM), New Zealand
Edition
Undated web guidance
Published
unknown
Effective
unknown
Supersedes
unknown
Band
5.9 GHz (discussed, not allocated) MHz
Technology
DSRC
Applies to
Not stated
Access
Free — RSM
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read on 29 September 2026 and demonstrably stale: the page still looks forward to "the next World Radio Conference in 2019" and promises an update afterwards, carries no last-updated date, discusses DSRC and C-ITS but not C-V2X or ITS-G5, and states no authorisation type and no allocation decision. It is recorded as historical guidance for that reason. This does not mean New Zealand has no ITS spectrum position — only that no current one was established from this source, and a newer gazette notice or spectrum plan should be sought before anyone relies on it. Re-read on 29 September 2026 and unchanged. New Zealand's current position is now recorded separately: the Minister's direction of 28 July 2026 reserving 5875-5925 MHz from new radio licences.

Read it at Radio Spectrum Management →

Ato n. 14.448/2017, Annex I item 22 Technical requirements for conformity assessment of restricted-radiation radiocommunication equipment — Annex I item 22, Vehicular Communication System

Ato n. 14.448, de 4 de dezembro de 2017 — Anexo I, item 22: Sistema de Comunicacao Veicular

Published finalEquipment conditionRadio and access

Brazil regulates 5.9 GHz vehicular communication as restricted-radiation equipment rather than as a licensed service. This is the operative instrument: it fixes the band, the channel plan and the power limits that Brazilian type approval tests against.

Relevance to 5.9 GHz LTE C-V2X PC5 A PC5 device sold in Brazil is certified against this item. The channel raster is 10 MHz with aggregation allowed, which matches PC5 numerology, but the act cites EN 302 571 only and asserts nothing about which access layer may be used, so no Brazilian authorisation specific to PC5 is claimed here.

Jurisdiction
Brazil
Issuing organisation
Agencia Nacional de Telecomunicacoes (Anatel)
Edition
Consolidated text, item 22 as given by Ato n. 4.776 of 1 September 2020; Annex I last amended by Ato n. 14.158 of 1 October 2025
Published
4 December 2017
Effective
1 September 2020
Supersedes
unknown
Band
5850–5925 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — Anatel legislation portal
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read from Anatel's own consolidated text on 29 September 2026. Item 22 of Annex I is headed SISTEMA DE COMUNICACAO VEICULAR and was given its current wording by Ato n. 4.776 of 1 September 2020. Item 22.1 applies to equipment operating in 5.850-5.925 MHz. Item 22.1.1 sets a 10 MHz device channel with aggregation permitted, and Table XVII lists seven channels from 5855 to 5925 MHz. Item 22.2 sets maximum EIRP of 23 dBm (200 mW) with a tolerance of plus or minus 2 dB for vehicle-to-vehicle and vehicle-to-infrastructure communication, and item 22.2.1 permits up to 26 dBm (400 mW) EIRP for high-power vehicle-to-infrastructure communication. Item 22.2.2 limits channels 5 to 7 to traffic and vehicular safety applications. Item 22.3 requires conformity with seven named clauses of ETSI EN 302 571 V2.1.1. The act names no radio technology: it cites EN 302 571, which is a band standard, not an access layer. The amendment history of Annex I was read from the same consolidated page.

Read it at Agencia Nacional de Telecomunicacoes →

Resolucao Anatel n. 789/2026 National plan for the attribution, destination and distribution of frequency bands (PDFF)

Resolucao Anatel n. 789, de 6 de julho de 2026

Published finalMandatorySpectrum

Brazil's frequency allocation plan. It is catalogued because the 5.9 GHz row is the reason the vehicular communication rules sit in the equipment act rather than in a spectrum destination.

Relevance to 5.9 GHz LTE C-V2X PC5 No PC5 destination exists in this table and none is implied. The plan is recorded so that a reader checking Brazil against the allocation plan alone does not conclude that 5.9 GHz V2X is unregulated there.

Jurisdiction
Brazil
Issuing organisation
Agencia Nacional de Telecomunicacoes (Anatel)
Edition
As published in the DOU of 13 July 2026
Published
13 July 2026
Effective
unknown
Supersedes
unknown
Band
5850–5925 MHz
Technology
Technology neutral
Applies to
Not stated
Access
Free — Anatel legislation portal
Last verified
14 October 2026
Verification note — Publisher’s own text read

Read from Anatel's own text on 29 September 2026. The resolution approves the current PDFF and is recorded on the same page as revoking Resolucao n. 772 of 16 January 2025. In the frequency table the 5850-5925 MHz row carries the fixed, fixed-satellite (Earth-to-space) and mobile services with amateur and amateur-satellite secondary, and the Brazilian destination column lists conditioned access, multimedia communication, private limited and switched fixed telephony services. There is no intelligent transport or V2X destination in that row. That is a substantive negative finding from the publisher's own table, not a failed search: Brazilian 5.9 GHz vehicular communication is handled under the restricted-radiation regime, which needs no individual frequency destination. Re-read at source on 14 October 2026 from a GitHub runner: unchanged, including the Art. 3 revocation of Res. 772 and the 5850-5925 MHz row with no ITS or V2X destination.

Read it at Agencia Nacional de Telecomunicacoes →

TDRA UWB and SRD Regulations Regulations for Ultra-Wide Band and Short Range Devices

Published finalEquipment conditionRadio and access

The UAE authorises 5.9 GHz ITS as a class-authorised short-range device rather than by individual licence. This table row is the whole of the permission: band, power, and the standards it is tested to.

Relevance to 5.9 GHz LTE C-V2X PC5 The two radio standards this row names are EN 302 571 and EN 302 663. EN 302 663 is the ITS-G5 access layer, not PC5. The UAE row is therefore recorded as an ITS-G5 reference and no UAE permission for 5.9 GHz LTE C-V2X PC5 is asserted from it.

Jurisdiction
United Arab Emirates
Issuing organisation
Telecommunications and Digital Government Regulatory Authority (TDRA)
Edition
Version 5.0, document date 30 October 2023
Published
30 October 2023
Effective
unknown
Supersedes
unknown
Band
5855–5925 MHz
Technology
ITS-G5
Applies to
On-board units, Roadside units
Access
Free — TDRA
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read from TDRA's own PDF on 29 September 2026; the cover states Version 5.0, document date 30 October 2023, superseding the Version 4.0 of 21 December 2020 that was also read for comparison. Article 1.2 states that the regulations set the conditions for the authorization and use of these devices under Class Authorization. The ITS, TTT and Railway table carries a row for 5855 MHz to 5925 MHz, usage Intelligent Transport Systems (ITS), 33 dBm (2 W e.i.r.p.), referencing ITU-R M.2121, EN 302 571 and EN 302 663. The same table carries 5795-5805 MHz and 5805-5815 MHz for transport and traffic telematics at 2 W e.i.r.p. The ITS row is identical in Version 4.0 and Version 5.0. The UAE National Frequency Plan Version 3.0 (2020) was also read: its 5850-5925 MHz row allocates fixed, fixed-satellite (Earth-to-space) and mobile and carries footnote UAE 14, which points to these regulations. No later edition of the National Frequency Plan was established, because TDRA's plan page is script-driven and did not render a document list.

Read it at Telecommunications and Digital Government Regulatory Authority →

MODA announcement 數位資源字第1146000426號 V2X innovation experimental network frequency (5850-5925 MHz) — specific experimental sites and other test conditions

車聯網創新實驗網路頻率(5850-5925MHz)特定實驗場域及其他測試條件

Published finalMandatorySpectrum

Taiwan's 5.9 GHz V2X spectrum is an experimental regime with a published list of permitted test sites. This is the instrument that says where a V2X experimental network may operate, and it is not a nationwide authorisation.

Relevance to 5.9 GHz LTE C-V2X PC5 The announcement names no radio technology, so it neither permits nor excludes PC5 on its face. What it does establish is that any Taiwanese 5.9 GHz deployment today is an experimental network confined to listed sites, which is the fact a deployment plan needs.

Jurisdiction
Taiwan
Issuing organisation
Ministry of Digital Affairs (MODA), Taiwan
Edition
Version 114.02, announced 27 February 2025
Published
27 February 2025
Effective
27 February 2025
Supersedes
unknown
Band
5850–5925 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — Executive Yuan Gazette
Last verified
29 September 2026
Related
TCROS 2024
Verification note — Publisher’s own text read

Read from the Executive Yuan Gazette (volume 031, issue 037, 27 February 2025) on 29 September 2026. The subject line amends the specific experimental sites and other test conditions for the V2X innovation experimental network frequency 5850-5925 MHz and states that the amendment takes effect the same day. The legal basis given is point 2, subparagraph 4, item 2 of the Radio Frequency Supply Plan. The annex lists named roads, intersections and areas by county. Two corrections to this site's earlier understanding follow. First, the authority for Taiwan's frequency table and supply plan is MODA, not the NCC, which is why the former NCC frequency pages could not be found. Second, 5850-5925 MHz in Taiwan is an innovation experimental band with named test sites, not a general assignment. MODA's own amendment explanation for the frequency allocation table states that the band is to be planned for V2X use and that 5925-5945 MHz is reserved as a guard band, following the EU approach. MODA's published consultation result records that it declined to fold the experimental site conditions into that amendment. The NCC low-power device rule LP0002 could not be read: every NCC host returned HTTP 403.

Read it at Ministry of Digital Affairs →

MIC Frequency Assignment Plan (kokuji) Frequency Assignment Plan — 5888-5925 MHz

周波数割当計画

Published finalMandatorySpectrum

Japan is clearing 5888-5925 MHz for 5.9 GHz V2X by moving the incumbent broadcast fixed links out. The plan now permits a mobile assignment in the band; the station designations that would make it usable begin in 2028 in four regions.

Relevance to 5.9 GHz LTE C-V2X PC5 This is the band Japan is preparing for 5.9 GHz V2X, and the plan is technology-neutral on its face. It is catalogued to keep a plan separate from an effective assignment: as of this verification pass no Japanese 5.9 GHz V2X station designation is yet available, and Japan's deployed ITS radio is the 700 MHz system in ARIB STD-T109.

Jurisdiction
Japan
Issuing organisation
Ministry of Internal Affairs and Communications (MIC), Japan
Edition
Edition current as at 1 April 2026; the 5888-5925 MHz amendment was promulgated and came into force on 30 January 2026
Published
30 January 2026
Effective
30 January 2026
Supersedes
unknown
Band
5888–5925 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — MIC Radio Use Website
Last verified
29 September 2026
Verification note — Publisher’s own text read

Table 2 of the plan (27.5 MHz to 10000 MHz), edition current as at 1 April 2026, was read from MIC's own PDF on 29 September 2026. The 5888-5925 MHz domestic row carries the fixed service for telecommunications-business and broadcasting-business use, fixed-satellite (Earth-to-space) for telecommunications-business and public-service use, and the mobile service for public-service and general-service use. The row note limits broadcasting-business use to 31 March 2031. MIC's own briefing of 23 March 2026 to the MLIT council on digital infrastructure for automated driving states that the assignment-plan change and the notice defining first-category new stations were promulgated and came into force on 30 January 2026; that the mobile public-service and general-service categories were added specifically to make a V2X assignment possible; that 5895-5925 MHz is the range the new-station notice covers; that a revision of the Radio Law review standards is planned during fiscal 2026 to let regional bureaus designate 5895-5925 MHz to V2X stations from 1 April 2028 in the Kanto, Tokai, Kinki and Tohoku regions; and that CIAJ was recommended on 11 March 2026 as the designated frequency-change body, effective 1 April 2026. The plan itself names no technology; the V2X purpose is stated in the MIC briefing, not in the table.

Read it at Ministry of Internal Affairs and Communications →

MSIT Notice 2024-44 Table of Frequency Allocation of the Republic of Korea — note K127A

대한민국 주파수 분배표

Published finalMandatorySpectrum

Korea's allocation instrument for 5.9 GHz. It designates 5855-5925 MHz for intelligent transport systems and says nothing about which radio technology may be used there.

Relevance to 5.9 GHz LTE C-V2X PC5 Seventy megahertz designated for ITS, technology unspecified in the allocation itself. A PC5 claim for Korea cannot rest on this note alone; the technology split lives in instruments this pass did not read.

Jurisdiction
South Korea
Issuing organisation
Ministry of Science and ICT (MSIT), Republic of Korea
Edition
Notice 2024-44, promulgated and effective 17 February 2025
Published
17 February 2025
Effective
17 February 2025
Supersedes
unknown
Band
5855–5925 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — Korean Law Information Center
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read on 29 September 2026 from the Korean Law Information Center, which serves this notice and its annex as the publisher of record. The register entry gives the notice number 2024-44, the promulgation and effective date 17 February 2025, MSIT as the competent ministry and the status as currently in force. In the annexed allocation table the 5850-5925 MHz row carries fixed, fixed-satellite (Earth-to-space), mobile and radiolocation, and the Korean use column reads intelligent transport system (ITS) with footnote K127A. K127A reads, in full, that the 5855-5925 MHz band is used for intelligent transport systems. The table names no radio technology, so the long-running Korean choice between WAVE and C-V2X is not settled by this instrument. The MSIT technical standard for radio equipment usable without notification (Notice 2026-10, 10 February 2026) was also read and does not cover 5855-5925 MHz, which confirms that Korean ITS radio is not an exempt class.

Read it at Ministry of Science and ICT →

TNRBF note F92a National table of frequency band allocation — national note F92a

Tableau national de repartition des bandes de frequences, note F92a

Published finalMandatorySpectrum

France's implementation of the EU ITS designation, in the instrument that actually governs French spectrum. It is worth reading because it records what the EU decision does not: that Defence shares this band and that the rail split is real.

Relevance to 5.9 GHz LTE C-V2X PC5 The note is technology-neutral, as the EU decision it implements is. It matters to a PC5 deployment in France mainly for what it constrains: the top 10 MHz of the ITS designation is reserved for urban rail, and Defence is a co-assignee across the road ITS range.

Jurisdiction
France
Issuing organisation
Agence nationale des frequences (ANFR) / Prime Minister of France
Edition
Annex to the Prime Minister order of 18 April 2025 (Journal officiel of 19 April 2025), consolidated after the modification of 26 May 2026 (Journal officiel of 27 May 2026)
Published
19 April 2025
Effective
27 May 2026
Supersedes
unknown
Band
5875–5925 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — ANFR
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read from ANFR's own consolidated PDF on 29 September 2026. The cover states that the table is the annex to the Prime Minister order of 18 April 2025 published in the Journal officiel of 19 April 2025, consolidated after the modification of 26 May 2026 published in the Journal officiel of 27 May 2026, with the rendering corrected on 14 August 2026. The 5875-5905 MHz and 5905-5925 MHz rows are assigned to Defence and to ARCEP and carry national note F92a. F92a states that, in accordance with Decision (EU) 2020/1426 of 7 October 2020, the 5875-5935 MHz band is designated for intelligent transport systems; that use of 5925-5935 MHz by intelligent transport systems is limited to urban rail systems; that ARCEP coordination is not required in 5875-5925 MHz for intelligent transport systems with respect to Defence; and that Defence will take intelligent-transport-system safety aspects into account in its own use. This is the first EU member state other than Germany added to the catalogue, and it is added because the national instrument itself could be read, not because the EU decision applies.

Read it at Agence nationale des frequences →

Minister for Media and Communications direction, 28 July 2026 Ministerial direction reserving 5875-5925 MHz from new radio licences

Published finalMandatorySpectrum

New Zealand has not allocated 5.9 GHz for ITS. It has done something more specific: reserved 5875-5925 MHz from new licences pending a government decision, with short-term trial licences the only route in.

Relevance to 5.9 GHz LTE C-V2X PC5 A New Zealand PC5 deployment today would need a short-term trial licence, because the band is closed to new ordinary licences by this direction. That is the current position, and it replaces any inference drawn from the undated RSM guidance page.

Jurisdiction
New Zealand
Issuing organisation
Radio Spectrum Management (RSM), New Zealand
Edition
As published by RSM in its Statements of Government Policy and Directions
Published
28 July 2026
Effective
28 July 2026
Supersedes
unknown
Band
5875–5925 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — RSM
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read from RSM's own page on 29 September 2026. The page states that on 28 July 2026 the Minister directed that new radio licences cannot be granted in certain frequency ranges except on a short-term basis, and lists 5875 MHz to 5925 MHz among them, alongside 184-210 MHz, 1427-1525 MHz and 1900-1910 MHz. It states that the Minister reserved these frequencies for possible new uses subject to future government decision, and that short-term new licences are permitted for trialling new technologies or for specific short-term events. This is dated and current, which the older RSM ITS guidance page is not; the guidance page was re-read the same day and still looks forward to the 2019 World Radiocommunication Conference. The underlying gazette notice was not retrieved, so the direction is recorded as RSM publishes it.

Read it at Radio Spectrum Management →

国无办函〔2024〕113号 Notice further clarifying the technical requirements for V2X direct communication radio transmitting equipment

国家无线电办公室关于进一步明确车联网直连通信无线电发射设备有关技术要求的通知

Published finalMandatoryRadio and access

China's 2024 refinement of the 5905-5925 MHz channel plan, splitting the original single 20 MHz channel into a 10 MHz or 20 MHz choice with different sub-bands for vehicle and roadside equipment.

Relevance to 5.9 GHz LTE C-V2X PC5 Directly relevant: it changes the channel bandwidths a Chinese PC5 device may use, and it separates the vehicle-side and roadside 10 MHz options into different halves of the band.

Jurisdiction
China
Issuing organisation
State Radio Office of China (MIIT Radio Regulatory Bureau)
Edition
As issued, 11 December 2024
Published
11 December 2024
Effective
unknown
Supersedes
unknown
Band
5905–5925 MHz
Technology
5.9 GHz LTE C-V2X PC5
Applies to
On-board units, Roadside units
Access
Free — MIIT website, full notice appended to the radio bureau news item of 18 December 2024
Last verified
14 October 2026
Verification note — Publisher’s own text read

Read at source on 14 October 2026. MIIT publishes the notice in full on its own site, appended to a radio bureau (无线电管理局) news item of 18 December 2024 titled 工业和信息化部优化调整车联网直连通信信道配置 助力车联网产业高质量发展, rather than in its document library, which is why earlier passes did not find it. Fetched live through a GitHub Actions runner (run 38556041532), because this desk is geo-filtered from Chinese hosts; an Internet Archive capture of the same page from 27 December 2024 carries identical provisions. Issued by 国家无线电办公室 on 11 December 2024 to the provincial radio administrations, the Ministry of Transport radio office and the National Radio Monitoring Center. Item 1: vehicle-borne or portable V2X direct-communication transmitting equipment may use a 10 MHz channel (5905–5915 MHz) or a 20 MHz channel (5905–5925 MHz). Item 2: roadside transmitting equipment may use 10 MHz (5915–5925 MHz) or 20 MHz (5905–5925 MHz). Item 3: use management and all other technical requirements continue under the 2018 management rules (工信部无〔2018〕203号). The notice sets no power figures and no new licensing route. Earlier passes held this record as secondary, corroborated by a municipal bureau page, trade reporting and the National Radio Monitoring Center's list of the ten major radio-management events of 2024; the operative text read at source agrees with that corroboration.

Read it at State Radio Office of China →

Orden TDF/732/2026 (BOE-A-2026-15661), nota UN-144 National Table of Frequency Allocations (CNAF) — national note UN-144, Intelligent Transport Systems

Cuadro Nacional de Atribucion de Frecuencias, nota UN-144 Sistemas de transporte inteligentes (STI)

Published finalMandatorySpectrum

Spain's implementation of the EU ITS designation, and the clearest national statement of the split: road ITS below 5925 MHz needs no individual licence, urban rail above 5915 MHz does, and the 10 MHz between them is infrastructure-to-vehicle only.

Relevance to 5.9 GHz LTE C-V2X PC5 Technology-neutral like the EU decision it implements, and it names EN 302 571 rather than an access layer. What matters to a PC5 deployment is the authorisation class: road ITS below 5925 MHz is general authorisation in Spain, so no individual licence is needed, and the 5915-5925 MHz segment is infrastructure-to-vehicle only.

Jurisdiction
Spain
Issuing organisation
Ministerio para la Transformacion Digital y de la Funcion Publica (Spain)
Edition
Approved 10 July 2026; published BOE num. 173 of 17 July 2026
Published
17 July 2026
Effective
18 July 2026
Supersedes
unknown
Band
5875–5935 MHz
Technology
Technology neutral
Applies to
On-board units, Roadside units
Access
Free — Boletin Oficial del Estado
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read on 29 September 2026 from the BOE's own PDF of the original publication, pages 101271-101272. The consolidated HTML text does not render the national notes, which is why an earlier pass could not find them; the annex is in the daily-edition PDF. The 5850-5925 MHz row of the table carries notes UN-51, UN-87, UN-143 FWA, UN-144 STI, UN-145 TLPR and UN-154. UN-144 states that 5875-5935 MHz is designated on a non-exclusive basis for intelligent transport systems in accordance with Decision (EU) 2020/1426; that 5925-5935 MHz is limited to urban rail ITS; that road ITS has priority below 5915 MHz and urban rail ITS above it; and that in 5915-5925 MHz road ITS applications are limited to those involving only infrastructure-to-vehicle connectivity. Transmitters are capped at 33 dBm e.i.r.p. with a maximum power spectral density of 23 dBm/MHz e.i.r.p. and transmit power control with a 30 dB range, per ECC/DEC(08)01. The note names ETSI EN 302 571 as the reference technical standard in the 5.9 GHz band. Road ITS below 5925 MHz is uso comun (general authorisation, no individual licence); urban rail ITS in 5925-5935 MHz is uso privativo and needs an individual authorisation. UN-144 also assigns 63.72-65.88 GHz to other ITS components at 40 dBm e.i.r.p. under ECC/DEC(09)01.

Read it at Ministerio para la Transformacion Digital y de la Funcion Publica →

MSIT Notice 2026-9, Article 4(12) Radio equipment for radio stations that may be established without notification — Article 4(12), ITS devices

신고하지 아니하고 개설할 수 있는 무선국용 무선기기 제4조제12호

Published finalEquipment conditionRadio and access

The operative Korean split of the 5.9 GHz ITS band, by power class rather than by named technology: 4 W EIRP in the lower 20 MHz, 2 W in the upper 30 MHz, with 20 MHz between them in neither class.

Relevance to 5.9 GHz LTE C-V2X PC5 This is the rule a Korean on-board unit is built and certified to, and it is where the band is actually divided. It constrains power and sub-band but names no access layer, so no Korean PC5 authorisation follows from it either way.

Jurisdiction
South Korea
Issuing organisation
Ministry of Science and ICT (MSIT), Republic of Korea
Edition
Notice 2026-9, promulgated and effective 10 February 2026
Published
10 February 2026
Effective
10 February 2026
Supersedes
unknown
Band
5855–5925 MHz
Technology
Technology neutral
Applies to
On-board units
Access
Free — Korean Law Information Center
Last verified
30 September 2026
Verification note — Publisher’s own text read

Read on 29 September 2026 from the Korean Law Information Center. The register entry gives notice number 2026-9, promulgated and effective 10 February 2026, MSIT as the competent ministry, status currently in force. Article 4(12) applies to land mobile stations installed for intelligent transport system service under Article 19 of the National Radio Research Agency technical standard for other business-use radio equipment, and splits the band by power class: 5855-5875 MHz at an antenna supply power of 200 mW or less (equivalent isotropically radiated power 4 W or less), and 5895-5925 MHz at 100 mW or less (EIRP 2 W or less). The same split appears in the conformity-assessment notice as four device codes, ITSRL and ITSOL for 5855-5875 MHz and ITSRW and ITSOW for 5895-5925 MHz, separating base stations from land mobile stations. RESOLVED 30 September 2026: [별표 1] 적합성평가 대상기자재 (Annex Table 1, equipment subject to conformity assessment) to the 방송통신기자재등의 적합성평가에 관한 고시 was read directly from law.go.kr. Its own row structure gives ITSRL and ITSRW as "기지국의 송수신장치" (base-station transceiver) at, respectively, "(5855∼5875㎒)" and "(5895∼5925㎒)"; and lists ITSOL and ITSOW under item 12, "지능형교통시스템용 무선기기" (ITS radio equipment), as sub-item 가) "5855∼5875㎒의 무선기기" and sub-item 나) "5895∼5925㎒의 무선기기" respectively. So L identifies the 5855-5875 MHz sub-band and W the 5895-5925 MHz sub-band; that is what the letters denote in the table. The annex does not spell out an expansion of either letter (no "Low"/"Wide", no "LTE"/"WAVE"), so that etymology stays unverified and is not asserted. Also note 5875-5895 MHz falls in neither class. A transitional provision let stations licensed before the 2023 amendment run under the old rules until 31 December 2024. The notice requires manufacturers and sellers to tell users that the frequency band may change under government ITS and spectrum allocation, reclamation and reallocation policy.

Read it at Ministry of Science and ICT →

LP0002 Technical Regulations for Low-power Radio-frequency Devices (LP0002)

低功率射頻器材技術規範(電信技術規範 檢驗規範 LP0002)

Published finalEquipment conditionRadio and access

Taiwan's low-power device rule, catalogued for what it does not contain. Its 5 GHz coverage ends at 5875 MHz, so it is not the route by which 5.9 GHz V2X equipment is approved in Taiwan.

Relevance to 5.9 GHz LTE C-V2X PC5 None, and establishing that is the value. A reader looking for the Taiwanese device rule behind 5.9 GHz PC5 will find LP0002 first and should know it stops 25 MHz short of the band.

Jurisdiction
Taiwan
Issuing organisation
National Communications Commission (NCC), Taiwan
Edition
Promulgated 15 July 2020; current amendment 6 February 2024
Published
15 July 2020
Effective
6 February 2024
Supersedes
unknown
Band
5725–5875 (5.9 GHz NOT covered) MHz
Technology
Technology neutral
Applies to
Not stated
Access
Free — NCC legal database
Last verified
29 September 2026
Verification note — Publisher’s own text read

Read on 29 September 2026 from the NCC's own legal database and its own PDF of the regulation, after every command-line and CI fetch returned HTTP 403; a desktop browser was the route that worked. The record gives the promulgation date as 15 July 2020 and the current amendment as 6 February 2024, with three annexes on transmitter, direct-sequence and frequency-hopping test procedures. The substantive finding is a negative one, and it is the point of this record: LP0002's 5 GHz provisions stop at 5875 MHz. Clause 4.10 covers 2400-2483.5 MHz, 5725-5875 MHz and 24.00 GHz and above; the hopping and power clauses cover 5725-5850 MHz; the field-strength table runs to 5725-5875 MHz. The words for V2X and intelligent transport do not appear, and neither 5850-5925 nor 5905-5925 MHz appears anywhere. So Taiwanese 5.9 GHz V2X equipment is NOT authorised as a low-power device under LP0002, which is consistent with the band being an experimental-network regime administered by MODA. Whatever equipment approval applies to a Taiwanese V2X experimental station, it is not this instrument.

Read it at National Communications Commission →

Jurisdiction views

By country.

Each country page carries the context — who decides what, and what is still open — and links back to the records above rather than restating them. Where a jurisdiction has a record but no page of its own, the record here is the whole of what this site holds on it.

How to read a record

An instrument, not an impression.

Every row records a document, at a stated edition, and what that document actually does. A spectrum authorisation does not define messages or security. A standards-body document is not automatically a legal requirement. A consultation is not a final rule. Those three confusions account for most of what is written wrongly about V2X regulation, so status and binding effect are separate fields here and neither is inferred from the other.

Status is the document’s own condition: published final, draft or in consultation, superseded, historical, or unverified. Binding effect is what it does to you: mandatory, a condition attached to equipment, voluntary, guidance, or unknown. A published standard with a voluntary binding effect obliges nobody. Where a field could not be established from the publisher, it says unknown rather than carrying a plausible guess, and each record’s verification note says which text was read and which was not.

Published is not implemented. A document appearing in this catalogue says that it exists and what it contains. It says nothing about whether Ambimat — or anyone else — has implemented it, conformed to it, been certified against it, or received any approval under it. No such claim is made anywhere on this site.

Coverage of other technologies is comparative reference. Ambimat’s product scope is 5.9 GHz LTE C-V2X PC5: its AmbiOBU and AmbiRSU development platforms are designed for it. DSRC, Japan’s 700 MHz ITS, NR-V2X and everything else here is catalogued because a reader comparing markets needs it, not because it is supported. Each record states its relevance to PC5 explicitly, including where that relevance is none.

We do not host paid or copyrighted standards. Every record links to the publisher, and the access field says what the publisher charges and what its licence permits.

Open questions

What this pass did not settle.

A catalogue is only honest if it publishes its own gaps. None of the following should be read as an assertion that a country has no instrument — only that this pass did not establish one.

  • The Netherlands. The instrument is identified — the Nationaal Frequentieplan 2014, BWBR0035791 — and its annex still could not be read. This desk times out on the Dutch government hosts, a CI runner gets HTTP 403 on that regulation, and a desktop browser fails to render it. No record is created from an identifier alone.
  • India. Both Indian sources answer HTTP 403 to every non-browser client from every network tried. The records stand on the earlier reading and have not been re-verified this pass.
  • Korea’s technology labels. The band split is now recorded, by power class. What the device codes ITSRL and ITSRW stand for is not: they are consistent with LTE and WAVE, and no text read so far says so.
  • Japan’s effective designation. The assignment plan permits a mobile assignment in 5888–5925 MHz. Station designations in 5895–5925 MHz are planned from 2028 in four regions and depend on a review-standards revision not yet made, so this is still a plan and is not described here as an effective authorisation.
  • Every record’s full text. The catalogue records what each instrument says about band, status and binding effect. It does not reproduce paywalled or copyright-restricted text, and where only a bibliographic record was read — GB/T 45315-2025 is the clearest case — the note says so and no test parameter is asserted.

Found an error, or an instrument that belongs here? Tell us — corrections to this catalogue are welcome and are checked against the publisher before anything changes.

Frequently asked

Questions this page answers.

Is a published V2X standard the same as a legal requirement?

No, and conflating the two is the most common error in V2X regulatory writing. A document's status — published final, draft, superseded, historical — describes the document. Its binding effect — mandatory, a condition attached to equipment, voluntary, guidance, or unknown — describes what it does to you. China's GB/T 45315-2025 is a published national standard with a voluntary binding effect. Canada's RSS-252 Issue 3 is a condition of equipment certification. Both are published; only one of them stops you selling a product.

Does a document appearing in this catalogue mean Ambimat complies with it?

No. The catalogue records that a document exists, at a stated edition, and what it contains. It makes no claim that Ambimat — or anyone else — has implemented it, conformed to it, been certified against it, or received any approval under it. No such claim is made anywhere on this site.

Why does the catalogue include DSRC and 700 MHz documents?

Because a reader comparing markets needs them. Ambimat's product scope is 5.9 GHz LTE C-V2X PC5, the radio its development platforms are designed for. Singapore's DSRC specification and Japan's ARIB STD-T109 at 700 MHz are catalogued as comparative reference and are explicitly outside that scope; each record states its relevance to PC5, including where that relevance is none.

How current is this catalogue?

Every record carries its own last-verified date and a note saying which text was read. The current pass is 29 September 2026, and 18 of the 23 records were read from the publisher's own text; the rest say what was used instead and why. Regulatory content decays quickly, so check the publisher's copy before relying on any figure for a commercial decision.

Can I download the standards from here?

No, and deliberately. Several of these documents are paid or carry redistribution restrictions — SAE J2735 is a paid standard, and IMDA's specification may not be distributed without written permission. Every record links to the publisher's own copy and states the access conditions.

Last updated 2026-10-22 · Technical reference maintained by Ambimat Electronics, Ahmedabad, India. Corrections: v2x@ambimat.com